HOME > Product > MainTenance Equipment   
   
  Rail-heating machine
 
     
 
     
     
     


 
-  Speed : Over 30km/h 
-  Consecutive operation time : Over 120 minutes 
-  Fuel : LPG 
-  Gas evaporation capacity : 120kg/h 
-  Hot water control capacity : over 45l  
-  Hot water temperature : 50~75”ĘC 
-  Burner for Boiler : Allied fuel intake type 31,000 kcal/h 
-  LPG case : Max 50kg 
-  Gas pressure : 1.0~1.5kg/cm2